Scientific and research projects
- Optimization of cutting plans in the Pronest LP softwarePdf
- Excel module with AI logic for calculating cutting schemes of steel profilesPdf

|
Operational program |
Environmental quality |
|
Co-financed fund |
European Regional Development Fund |
|
Priority axis |
4 Energy-efficient low-carbon economy in all sectors |
|
Specific objective |
4.2.1 Reducing energy intensity and increasing the use of renewable energy in enterprises |
|
Find |
European Regional Development Fund (hereinafter referred to as "ERDF") |
|
Beneficiary |
REMOZA s.r.o. |
|
ITMS 2014+ Code |
NFP310040N597 |
|
Náz's project |
Reducing the energy consumption of an industrial building – REMOZA s.r.o. |
|
Project objective |
Reducing energy consumption in the operation of an industrial building of REMOZA s.r.o. implementation of the optimal combination of energy saving measures resulting from the energy audit and, in particular, comprehensive renovation of the building's outer shell with replacement of opening fillings and roof insulation, installation of more energy-efficient lighting fixtures in the building and modernization of the heating, hot water and heat recovery system. Thanks to the above measures, it will be possible to reduce the consumption of primary energy in the form of natural gas for heating and hot water preparation by up to 74.4%, electricity consumption will be reduced by 57.2% and primary energy consumption will be reduced by 67.7%. |
|
Total eligible project expenses |
221 636.26 EUR |
|
Contracted amount of NFP |
188 390.82 EUR |
